Scheduled redirect: change a link's destination

Pick a date and time and your short link switches to a new page by itself. Plan a whole campaign ahead, with printed QR codes following each change.

On this page
  1. How a scheduled redirect works
  2. Schedule a link destination change
  3. Plan a whole campaign ahead
  4. Change or cancel a scheduled change
  5. What happens when the time comes
  6. Common questions
  7. Next steps

To schedule a link destination change, a scheduled redirect, you pick a date, a time and a new page, and the short link switches over by itself, so nobody has to be at a keyboard when the moment comes. The launch page goes live at nine, the sale ends on Sunday night, next season's menu takes over on the first of the month.

The short link stays the same, and so do its QR code and its stats. That's what makes it useful for anything already out in the world. A code printed on a box, a poster or a flyer can run one campaign after another with no reprint, and every change lands on time.

Before you start: you need a short link. No link yet? Start with how to create a short link. Scheduled changes depend on your plan; see pricing.

How a scheduled redirect works

You pick a time and a new destination. When the time comes, Brevily makes that page the link's destination, just as if you had edited it yourself.

  • It lands within a few minutes of the time you set. Brevily applies due changes every five minutes, and visitors see the new page a few minutes after that, so plan for "at nine o'clock or just after", not to the second.
  • Times are in your organisation's time zone, the one set in Settings › General › Time zone. The panel names it, so you can check before you schedule.
  • Each change uses one destination edit, counted when you schedule it rather than when it applies. The dialog shows how many of this period's edits you've used.
  • The new page is checked again just before the switch, not only on the day you scheduled it, so a page that turned unsafe in the meantime never goes live.
  1. Open Links and choose the link.
  2. Open its Routing tab and find Scheduled destinations.
  3. Choose Schedule change.
  4. Set From to the date and time the new page should take over.
  5. Enter the new Destination.
  6. Choose Schedule change.

[screenshot: the Schedule a change dialog with From, Destination and the edit note]

The change appears in the panel as Waiting, with its time and destination. The link's Overview also shows how many changes are waiting, so anyone on your team can see that something is lined up.

Plan a whole campaign ahead

A link can hold several changes in a row, which lets you set up a whole campaign in one sitting. Say a shop's window poster carries a QR code. For example:

  1. Today: the link goes to a "coming soon" page with a sign-up form.
  2. Friday at 09:00: it switches to the sale page.
  3. Monday at 00:00: it switches to the regular shop page.

The panel draws these as a timeline: the changes that have already applied, then Now with the link's current destination, then each change still Waiting, in order. A link can have up to 20 changes waiting at once.

[screenshot: the Scheduled destinations timeline with an applied change, Now and two waiting]

Change or cancel a scheduled change

Plans move. To drop a waiting change, choose Cancel beside it and confirm. The destination edit it used isn't given back.

To move a change to a different time or page, cancel it and schedule a new one. Changes that have already applied stay in the timeline as a record and can't be cancelled; to change the destination after that, edit the link or schedule another change.

What happens when the time comes

Within a few minutes of the time you set, people who tap the link or scan its code go to the new page. The Now row moves along the timeline to show the link's current destination.

A change is skipped, and the link keeps the page it had, when at that moment:

  • the new page is found unsafe,
  • the link has expired,
  • your organisation's plan no longer includes scheduled changes.

A skipped change is never applied late. If a switch didn't happen, check the Now row for the link's current destination; on plans with the Audit log, it records why.

Two things on the Routing tab decide who reaches the scheduled page:

  • Running an A/B test on the link? Its variants take the place of the link's own destination, so remove the variants for your scheduled changes to reach anyone. The panel reminds you with The A/B test comes first.
  • Using targeting rules? Visitors a rule matches still go to that rule's page. Everyone else gets the new destination.

Common questions

Will a printed QR code follow a scheduled destination change?

Yes. The code holds the short link, not the page behind it, so every printed copy goes to the new destination within a few minutes of the change applying.

Which time zone does a scheduled destination change use?

Your organisation's, set in Settings › General › Time zone. The same setting decides the days and hours in targeting rules.

Do I get the destination edit back if I cancel a scheduled change?

No. A scheduled change uses its destination edit when you schedule it, so cancelling doesn't return it. Scheduling the exact same change twice counts once.

Can I schedule a destination change on a link that expires?

Yes, as long as the change comes before the expiry date. The console won't accept a time after the link has ended.

Next steps

All how-to guides

Brevily is invite-only, for now

Say what you would use it for and a person replies. Already invited? Sign in.